We are certified ECOLEADERS - View Certification
Reduce your maintenance costs by 73% with the JDP pedestal

Let’s take the example of a municipality with 100 pedestals.

Note: Savings are expressed in current dollars; in reality, they will be even higher over time.

1. Lifespan: 50 years vs. 20 years

  • Traditional pedestal: full replacement every 20 years
    → Over 50 years: 2.5 replacement cycles
    → Cost per replacement: $8,000 × 100 pedestals = $800,000
    Total over 50 years: $2,000,000
  • JDP: full replacement only after 50 years
    → One single replacement: $800,000

2. Maintenance

Average maintenance: 2 interventions per pedestal per year
Labor: $100/hour

  • Traditional pedestal: 1 extra hour per intervention (e.g. in winter)
    → 100 pedestals × 2 interventions × 50 years × $100/hour = $1,000,000
  • JDP: no maintenance

50-Year Comparison – 100 Pedestals

CategoryTraditional PedestalJDPSavings with JDP
Replacements required2.5 replacements (every 20 years)1 replacement (after 50 years)1.5 replacements avoided
Cost per replacement$800,000$800,000
Total replacement cost$2,000,000$800,000$1,200,000
Annual maintenance2 interventions × 1 hrNone2 interventions avoided
Maintenance over 50 years$1,000,000$0$1,000,000
Total cost (50 years)$3,000,000$800,000$2,200,000
Total savings (%)73% savings


Cost reduction: $2.2 million, or 73% savings over 50 years.

The JDP pedestal isn’t just a technical decision — it’s a long-term financial strategy that can save municipalities millions in replacement and maintenance.